The application also seeks provision to modify and enhance the rail infrastructure to support the new station which could include: Remodelling of the existing track layout Installing two additional track loops to accommodate a four-platform station Enhancements to Shepreth branch junction Modification to the railway on the southern approach to Cambridge station Provision for overhead line electrification infrastructure and a substation Modification of existing signalling equipment Closure of two private level crossing and provision of alternative access NR 21.06.21 |
||