Railway Performance Society Magazine - Milepost

Isle of Wight stutters back into service.

Forum / News / Isle of Wight stutters back into service.

Reply         Subscribe         Start new thread         Syndicated Feed (RSS)        

Displaying 1 to 1 of 1 Previous   1   Next
Author Message
8001F

Posts: 5560
Location:
Isle of Wight stutters back into service. - Posted: November 1, 2021 - 12:31 PM Quote and reply
The Ryde to Shanklin line reopened today with a one train service according to RTT starting with the
0535 St Johns to Pier Head arr 1 late
0545 Ryde PH -Shanklin dep 3 late arr 10 late
0615 return 10 late terminates St Johns 15 late-"power failure"
0645 Ryde PH starts St Johns 10 late arr 11 late
0715 return 9 late loses 1 min.
0745 Ryde PH starts 6 late loses 4 mins
0815 return starts 9 late loses 1 min.
0845 Ryde PH and 0915 return cancelled for "unknown reason"
0945 Ryde PH on time drops 2 mins
1015 return 1 late, stn O/T at St Johns, P Head 8 late.
1045 Ryde PH 5 late drops 4 mins.
1115 return 5 late dropping 10 mins.

Not a good start, possibly affected by rail conditions.

IU midday Nov 1st

All services cancelled after 1600 due to signalling problems.
IU 2330 01/11/2021

Back to top View user profile     Contact this member