Forum / News / Severn Tunnel closure from Friday.
Reply Subscribe Start new thread Syndicated Feed (RSS)
Displaying 1 to 1 of 1 | Previous 1 Next |
Author | Message | ||
---|---|---|---|
8001F
Posts: 5528 Location: |
More than two miles of track, sleepers and ballast (the stones on the railway) will be replaced to ensure the continued safe and reliable operation of the railway. The new track will also enable the removal of a temporary 50mph speed restriction that has been in place in recent weeks, making passenger’s journeys quicker and more reliable in the future. The track work will affect Great Western Railway services from Friday 1 to Sunday 10 July. Trains between London and South Wales will use an alternative route between Swindon and Newport – stopping at Gloucester instead of Bristol Parkway A limited train service will still run between London Paddington and Bristol Parkway on weekdays only – otherwise travel via Bristol Temple Meads instead Buses replace trains between Bristol Parkway and Newport nr 29.06.202 |
||
Back to top | View user profile Contact this member |